Completed¶
- Confirmed staging candidates were archived under
archive/staging/. - Multiple data batches were published from dated physical directories into the current contract.
- Valid versions were added for
hsgt_top10,margin, andmargin_detail. - The
moneyflow_hsgtmanifest was corrected. moneyflow_thswas revalidated and published as the 20260908 version.- General research data, THS hot stocks, and the DC-concept candidate universe use the current contract.
- The DC-concept reader fails when the current contract is missing.
- An evening report was republished once using the new data directory.
Deferred¶
ths_member remains deferred because manifest.yml is missing and the TuShare endpoint is rate-limited.
Closeout findings¶
- Reads of
latestwere audited across deployment, research, publication, and recovery flows. - Publication-failure and rollback paths have dedicated fixtures, no-send checks, and tests.
- Minute materialization, context building, publication, and recovery still use
latest; keep it under the production contract instead of deleting it. ths_memberremains blocked by the live TuShare source and rate limits. Do not publish it before the recovery conditions are met.
Relationship to repository migration¶
The remaining work described here concerns cleanup of the current-assets compatibility layer inside the data platform. Migration of the old repository's capabilities is complete. Readable copies of the old repository and historical notes are under quant-market-data-platform/docs/migration/legacy-materials/ or quant-research/docs/migration/legacy-materials/. The latest, rollback fixture, compatibility-link, and ths_member items here concern data-production contract governance. The audit has recorded decisions; do not remove or publish these items without no-send, rollback, and recovery validation.
Current decision¶
No compatibility links were removed in this review. They still serve publication, recovery, minute materialization, or context-building flows, and removing them directly would increase production risk.
Before a future removal, first switch the corresponding reader and pass no-send, rollback, and recovery checks.